Explore our Services
With our modern fleet of Coiled Tubing Units in sizes 1 inch up to 1.75 inches SAPESCO Well Services Division (SWS) can design and perform several jobs through coiled tubing including;
Our Services
Pumping Operations
- Unloading wells with Nitrogen
- Stimulating formations (Acidizing)
- Removing Fill (Sand)
- Removing(Dissolving) organic deposits
- Isolating zones with cement ( plug & Squeeze)
- Cutting tubular with fluid
- Removing scale hydraulically
Mechanical Operations
- Logging with CT
- Perforating
- Fishing
- Operating Slide Sleeve
- Setting bridge plug or packer
- Running/Setting completions
- Removing Scale(milling)
- Cutting Tubular
