Corporate Brief
History
Organization Chart
Directors
Shareholders
Sister Companies
Partners & Alliances
Memberships & Affiliations
HSE Policy
Quality
Latest News
News archive
Services Overview
Well Services (SWS)
Measurements Services (SMS)
Industrial Services (SIS)
Offshore Services (SOS)
Exploration Services (SES)
Drilling Services (SDS)
Civil Services (SCS)
Current Tenders
Supplier Conditions
Supplier Registration
Career Development
Success Stories
Vacancies
Apply Online
Useful links
Technical papers
Country Statistics

Marine

Home » Services » SIS » Marine

Sapesco marine division, “Sapesco Offshore Services (SOS)”, provides Work Remote Operated Vehicles (WROV) for intervention and deep water topographical and pipeline surveys to very high international marine standards.
Equipment operates on vessels fully equipped to handle the constant stream of Dynamic Positioning System (DPS) Data provided from multiple sources.

Sapesco SIS provides complimentary services for all downstream activities including coiled pipe lay up to 4 ½” OD schedule 80, together with infield cable lay, power cable lay between shore and platform and platform to platform.

Where offshore platforms may prohibit the offloading of equipment due to size or weight restrictions, Sapesco SIS can mobilise DNV 2.7-1 containerised units for work from barges and supply boats.

An extensive array of equipment is available and this includes, but is not limited to the following: -
  1. Liquid Nitrogen Storage tanks
  2. Nitrogen Pump Units
  3. Large Volume High Pressure Oil Free Air Compressors
  4. High Volume Low Pressure Air Compressors
  5. Desiccant Drier Units
  6. Portable Mass Spectrometer Laboratories for Commissioning Leak Testing Services
  7. Portable Hydrotest Cabins
  8. Zone 1 (Electrical) and Zone 2 (Diesel / Hydraulic) pump units.
  9. SAE AS 4059 (NAS 1638 Class 3) 3-micron high pressure flushing units
  10. Mechanical Services Stud Bolt Torque and Tensioning Systems.

Talk to us, you will be surprised how helpful we can be.

Coiled Tubing Pipeline Laying (Reeled Pipe).

Coiled Tube Pipeline is a relatively new technology. The service offers an economical alternative to conventional sub sea control lines and offshore small diameter flow line construction techniques.
Additionally, simple installation of onshore surface or buried flow lines for gathering centres, tie-ins and high-pressure injection lines. Coiled Tubing Pipeline has the following advantages over conventional pipelines: -

In addition to a full oil and gas field capability, Sapesco have Coiled Tubing Pipeline lay equipment and technology for laying Pipelines up to 4½" diameter.

Equipment is also suitable for laying submarine multi-core communications cables, umbilical hydraulic lines and electrical power cables.

Coiled Pipe System

Description:

Modular built system consisting of diesel driven hydraulic power pack, spooling unit, spool loading cradle and skidding system DNV approved.

Service for lay up to 4.5 Coiled Pipe on sub-sea and land based tie-ins.

Power Pack Control Cabin

Primary mover 471 Detroit Diesel Max 127 BHP
Dimensions Length 3300mm
10 ft 8
Width 2250mm
7 ft 4
Height 2227mm
7 ft 3
Weight 6,000 Kg
Clutch Wichita air operated clutch 110 PSI
PTO Triple outlet drives
Hydraulic System Sun-Strand pump SPV24 main/P 1500 auxiliary Max WP: 3000 PSI closed loop system with quick disconnect points.
Fuel Capacity 380 litres
Fuel Consumption 0.7 Litres per Minute (LPM) under full load
Hydraulic oil capacity 380 litres
Control Panel Engraved stainless steel panel giving central control and visual displays, tension indicator, hydraulic and PTO controls.
Safety Emergency stop, fuel stop, fails safe system.

Spooler Tension Module

2 x Proclaim hydraulic motors with auto brakes. Hydraulic skidding and loading rams with controls. Skid beams with auxiliary mounting framework for containing pipe guide and roller system.

Dimensions Length 5m
16 ft 4
Width 2740mm
8 ft 10
Height 3304mm
10 ft 8
Weight 8,000 Kg

Spool Lifting Cradle

2 x Raising Rams 30 ton lift
2 x Skidding Rams 35 ton push & pull
2 x Skid Beam Gripper Rams 35-ton grip.

Dimensions Length 3.2m
12 ft 5
Width 3.201mm
10 ft 5
Height 1.450mm
4 ft 8
Weight 4,000 Kg

Welding Station

Full weather protected welding station to allow welding and NDT services to be carried out.

Dimensions Length 3200m
10 ft 5
Width 2400mm
7 ft 9
Height 2300mm
7 ft 6
Weight 2,000 Kg

Workshop/Stores:

Complete with all necessary handling and rigging equipment to carry out coiled pipe laying operations.

Dimensions Length 3450m
11 ft 3
Width 2404mm
7 ft 9
Height 2510mm
8 ft 2
Weight 1,000 Kg

Certification

DNV certificates of conformity and fitness to S 11974,289 safe area. Continued manned service.

References and Abridged Work History for Coiled Pipe & Cable Services

Early 1992 Mineral Management Services Approval - US Govt Body.
Aug 1992 First 3.5" pipeline laid in Vermillion Field Louisiana. 5000 ft in 80 ft water. Contractor-Quality Tubing Inc.
Nov 1993 First sub sea Hydraulic Umbilical control line in Egypt laid for Gupco by SAPESCO from j10 to GS 373-2 (sub sea wellhead) 4000 ft in 75 ft water.
May 1994 2000ft of Hydraulic Umbilical control line laid for GUPCO by SAPESCO from R-6 to R-22 in a water depth of 75 ft. (Different Equipment but similar Technique).
July 1993 Three 3.5" sub sea coiled pipelines laid for GUPCO by SAPESCO.
J 10-GS 373-2 3000 ft.
R 6-R22 2000 ft
SG 376-GS 367 45,000 ft.
Feb 1996 Three 3.5" sub sea coiled pipelines laid for GUPCO by SAPESCO.
Oct B - Complex Platform. 1800 ft.
M 55 - GS 347 2000 ft
M 50 - M 190. 1700 ft
Sep 1996 3.5" coiled pipeline for GUPCO by SAPESCO J 10 - J 37 5000 ft.
April 1997 4.5" coiled pipeline for Geisum Oil Co. between Well G16 and Platform WPB 10,000 ft long.
Feb 2001 2500 Metres of 3-core 35-mm2 conductor 57-mm2 SWA from WPB to WPA platforms for AGIBA
Feb 2004 2 of 4.5” Coiled pipelines each 2500-metres from SWP to MPA platforms for AGIBA

Topside Pipe work

Dec 1996 Construction, Installation and Commissioning of 4 Oxygen Valve Stands for Alexandria Iron and Steel Works. (Pipe work and Instrumentation).
April 1997 Geisum Oil Co - Topside pipe work for Coiled Pipeline connection on G10 Satellite Wellhead and WPB Platform.

For further information, please contact:

Technical Contact:
Stephen P. Smith
T: 5194800
E: steve@sapesco.com
Sales Contact:
Yasser Rezk
T: 5194800
E: sis@sapesco.com

© 2006-2007 Sahara Petroleum Services Company (SAPESCO). All Rights Reserved.
Printed from www.sapesco.com